Guernsey

Guernsey planning applications

3,350 applications from the island's planning register. Search by address, reference or what was proposed.

12 applications matching “HOTEL” in 2025

AddressProposalReferenceDecision
Pandora Hotel Hauteville St. Peter Port Guernsey GY1 1DGRaise, extend and alter roof ridge height and form (flat roof) at 2nd floor level (Protected Building).FULL/2025/1119Notification of Grant of Full Planning Permission.
Pandora Hotel Hauteville St. Peter Port Guernsey GY1 1DGRaise, extend and alter roof height and form (hipped and flat roof) at 2nd floor level (Protected Building).FULL/2025/1121Notification of Grant of Full Planning Permission.
Hotel Bon Port La Rue Gros Jehan La Rue Des Clotures St. Martin Guernsey GY4 6EWConvert and alter existing hotel and building (Use Class 7) into 6 residential units (Use Class 1) and associated works.FULL/2025/1331Notification of Grant of Full Planning Permission.
The Duke Of Richmond Hotel Cambridge Park Road St. Peter Port Guernsey GY1 1UYErect 3 domes on terrace and a shed to south (rear) elevation for temporary period (1st November 2025 - 1st January 2026).FULL/2025/1347Notification of Grant of Full Planning Permission.
Cobo Bay Hotel Cobo Coast Road Castel Guernsey GY5 7HBDemolish roadside wall to west elevation, erect new boundary wall and install two planters.FULL/2025/1393Notification of Grant of Full Planning Permission.
Le Friquet Country Hotel Rue De Friquet Castel Guernsey GY5 7STInstall signage to east (roadside) gable.FULL/2025/1490Notification of Grant of Full Planning Permission.
Le Pommier Hotel Route De La Hougue Du Pommier Castel Guernsey GY5 7FQVariation to previously approved plans to erect single storey building/staff accommodation and associated works to south boundary - alterations to sizFULL/2025/1667Notification of Grant of Full Planning Permission.
Wayside Cheer Hotel Grandes Rocques Castel Guernsey GY5 7FXVariations to Condition 6 and plans previously approved under FULL/2022/2265 for change of use of Hotel (Use Class 7) and Restaurant (Use Class 11) toFULL/2025/1706Notification of Grant of Full Planning Permission.
Cobo Bay Hotel Cobo Coast Road Castel Guernsey GY5 7HBExtend and alter at ground floor, 1st floor and 2nd floor levels and raise and alter roof form to create 3rd floor level to west (front) elevation, inFULL/2025/1841Notification of Grant of Full Planning Permission.
Cobo Bay Hotel Cobo Coast Road Castel Guernsey GY5 7HBExtend and alter staff accommodation at ground and 1st floor levels and raise roof ridge height to create 2nd floor level, including walkway at 1st flFULL/2025/1843Notification of Grant of Full Planning Permission.
St Pierre Park Hotel Rohais De Haut St. Andrew Guernsey GY6 8SSDemolish outbuildings and erect 12 staff accommodation flats with associated landscaping and change of use of identified land to hotel use.FULL/2025/1846Notification of Grant of Full Planning Permission.
Duke Of Richmond Hotel Cambridge Park St. Peter Port Guernsey GY1 1UYInstall a sign to the north (front) elevation.FULL/2025/1922Notification of Grant of Full Planning Permission.

What people apply for, and what gets approved

3,176 decided applications, grouped by what was being asked for. 93% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Extension83577051 94%
Walls, fences and access45540443 90%
Internal alterations40137516 96%
Demolish and rebuild29625733 89%
Garage, annexe or outbuilding29026321 93%
Windows and doors2502378 97%
Change of use17614520 88%
Roof works102982 98%
Garden building88785 94%
Signs and shopfronts62563 95%
Loft or dormer59581 98%
New dwelling49435 90%
Trees and landscaping31291 97%
Two-storey extension28253 89%
Solar or heat pump25212 91%
Porch22220 100%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Guernsey

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to States of Guernsey planning register.

Who applies for permission here And who draws it up