Guernsey planning applications
3,350 applications from the island's planning register. Search by address, reference or what was proposed.
13 applications matching “HOTEL” in 2024
| Address | Proposal | Reference | Decision |
|---|---|---|---|
| St Martins Hotel Les Merriennes St. Martin Guernsey GY4 6NR | Demolish former hotel and associated buildings and the removal of protected trees (revised). | FULL/2024/0037 | Notification of Grant of Full Planning Permission. |
| Bella Luce Hotel La Fosse De Haut St. Martin Guernsey | Variations to plans previously approved to Extend and alter Hotel complex, demolish dwelling and erect Wellness Centre and staff accommodation and fla | FULL/2024/0276 | Notification of Grant of Full Planning Permission. |
| Driftwood Inn Route De La Perelle St. Saviour Guernsey GY7 9NA | To change the use of part of the existing hotel (Use Class 7) to create seven residential flats/apartments (Use Class 2) and to upgrade and redesign t | FULL/2024/0277 | Notification of Grant of Full Planning Permission. |
| L'Eree Hotel Route De La Rocque Poisson L'Eree St. Pierre Du Bois Guernsey GY7 9LQ | Variations to plans previously approved to convert, extend and alter hotel (Visitor Economy Use Class 7) to create 12 flats (Residential Use Class 2) | FULL/2024/0395 | Notification of Grant of Full Planning Permission. |
| Duke Of Richmond Hotel Cambridge Park Road St. Peter Port Guernsey GY1 1UY | Retain erected shed for temporary period (01/04/24 - 30/04/25). | FULL/2024/0429 | Notification of Grant of Full Planning Permission. |
| La Grande Mare Hotel Golf & Country Club Vazon Road Castel Guernsey GY5 7LL | Variations to previously approved plans for change of use of agricultural land to form part of golf course, demolish hotel and outbuildings, erect cou | FULL/2024/0868 | Notification of Grant of Full Planning Permission. |
| Bella Luce Hotel La Fosse St. Martin Guernsey GY4 6EB | Variation to condition 5 of permission reference FULL/2022/1283 to fell chestnut tree to north of site (site of Protected Building). | FULL/2024/0930 | Notification of Grant of Full Planning Permission. |
| L'Eree Hotel Route De La Rocque Poisson L'Eree St. Pierre Du Bois Guernsey GY7 9LG | Demolish existing building, outbuildings and substation, erect 3 buildings to contain 15 flats with associated works, erect 2 outbuildings to east of | FULL/2024/1198 | Notification of Grant of Full Planning Permission. |
| Duke Of Richmond Hotel Cambridge Park Road St. Peter Port Guernsey GY1 1UY | Erect 3 domes on terrace to south (rear) elevation for temporary period (7th October 2024 until 31st March 2025). | FULL/2024/1433 | Notification of Grant of Full Planning Permission. |
| Hotel De Havelet Havelet St. Peter Port Guernsey GY1 1BA | Install replacement windows to east (front) elevation (Protected Building). | FULL/2024/1476 | Notification of Refusal of Planning Permission. |
| Rocquettes Hotel Les Gravees St. Peter Port Guernsey GY1 1RN | Erect enclosure to covered patio area to south-west (front) elevation (from 1st November until 1st March each year for a 3 year period). | FULL/2024/1502 | Notification of Grant of Full Planning Permission. |
| The Old Government House Hotel Ann's Place St. Peter Port Guernsey GY1 2NU | Erection of temporary rooftop bar (from 21st October to 12th January each year for a 3 year period) to north elevation of building. (Protected Buildin | FULL/2024/1551 | Notification of Grant of Full Planning Permission. |
| Le Friquet Hotel Rue De Friquet Castel Guernsey GY5 7ST | Demolish outbuildings. Erect single storey outbuilding/pool plant room, erect wall and extend hardstanding around the pool area. | FULL/2024/1863 | Notification of Grant of Full Planning Permission. |
What people apply for, and what gets approved
3,176 decided applications, grouped by what was being asked for. 93% are granted overall — the interesting part is the spread.
| What was applied for | Decided | Granted | Refused | Success rate |
|---|---|---|---|---|
| Extension | 835 | 770 | 51 | 94% |
| Walls, fences and access | 455 | 404 | 43 | 90% |
| Internal alterations | 401 | 375 | 16 | 96% |
| Demolish and rebuild | 296 | 257 | 33 | 89% |
| Garage, annexe or outbuilding | 290 | 263 | 21 | 93% |
| Windows and doors | 250 | 237 | 8 | 97% |
| Change of use | 176 | 145 | 20 | 88% |
| Roof works | 102 | 98 | 2 | 98% |
| Garden building | 88 | 78 | 5 | 94% |
| Signs and shopfronts | 62 | 56 | 3 | 95% |
| Loft or dormer | 59 | 58 | 1 | 98% |
| New dwelling | 49 | 43 | 5 | 90% |
| Trees and landscaping | 31 | 29 | 1 | 97% |
| Two-storey extension | 28 | 25 | 3 | 89% |
| Solar or heat pump | 25 | 21 | 2 | 91% |
| Porch | 22 | 22 | 0 | 100% |
Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.
While you are here
Everything the data says about Guernsey
Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to States of Guernsey planning register.