Guernsey

Guernsey planning applications

3,350 applications from the island's planning register. Search by address, reference or what was proposed.

14 applications matching “STABLE” in 2024

AddressProposalReferenceDecision
Retot Cottage Retot Lane Castel Guernsey GY5 7EFErection of stables and tack room to south boundary.FULL/2024/0041Notification of Grant of Full Planning Permission.
Ville Vannier Pleinheaume Road Vale Guernsey GY6 8NPConvert stable/garage to residential dwelling and associated works (Revised Scheme).FULL/2024/0199Notification of Refusal of Planning Permission.
Grace Stables Les Damouettes Fields Fort Road St. Peter Port GuernseyVariation of condition 6 of FULL/2021/0802 to allow non-family users of up to 6 stalls within the western stable building to contribute towards runninFULL/2024/0351Notification of Grant of Full Planning Permission.
Land Rue De La Petite Hurette Castel GuernseyErect stable block and storage building to north boundary. (Revised scheme).FULL/2024/0411Notification of Grant of Full Planning Permission.
Le Colombier Farm Rue De Colombier Torteval Guernsey GY8 0NFVariations to previously approved plans to demolish extensions and stables, re-roof, demolish and rebuild chimneys, extend and alter at ground floor aFULL/2024/0490Notification of Grant of Full Planning Permission.
Grace Stables Les Damouettes Fields Fort Road St. Peter Port GuernseyErect awning to east elevation and store/electric cupboard to north elevation of day room (retrospective).FULL/2024/0559Notification of Grant of Full Planning Permission.
Grace Stables Fort Road St. Peter Port GuernseyInstall substation and enclosure to south-west boundary and associated works.FULL/2024/0620Notification of Grant of Full Planning Permission.
Grace Stables Fort Road St. Peter Port Guernsey GY1 1ZUInstall 6 water trough enclosures (retrospective).FULL/2024/0849Notification of Grant of Full Planning Permission.
Land Adjacent to Le Gardinet Ruette Des Cherfs Castel GuernseyErect temporary stables to south boundary (retrospective) (revised scheme).FULL/2024/1045Notification of Grant of Full Planning Permission.
Field To Rear of The Elms Rue De La Cache St. Sampson GuernseyErect stable and hardstanding on agricultural land to north-east boundary.FULL/2024/1046Notification of Grant of Full Planning Permission.
Les Courtes de Haut La Miellette Lane Vale Guernsey GY3 5EWErection of stable block to north boundary of Les Courtes de Haut, La Miellette Lane.FULL/2024/1246Notification of Grant of Full Planning Permission.
The Rosses Rue Des Eturs Castel Guernsey GY5 7DXDemolish existing stable and erect new stables to south east of site.FULL/2024/1344Notification of Grant of Full Planning Permission.
Stable Flat Oriana Lodge Rue des Fontenelles Forest Guernsey GY8 0BLDemolish shed and erect single storey extension to east (side) of property.FULL/2024/1357Notification of Grant of Full Planning Permission.
Grace Stables Fort Road St. Peter Port GuernseyErect single storey store to west boundary (revised location).FULL/2024/1556Notification of Grant of Full Planning Permission.

What people apply for, and what gets approved

3,176 decided applications, grouped by what was being asked for. 93% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Extension83577051 94%
Walls, fences and access45540443 90%
Internal alterations40137516 96%
Demolish and rebuild29625733 89%
Garage, annexe or outbuilding29026321 93%
Windows and doors2502378 97%
Change of use17614520 88%
Roof works102982 98%
Garden building88785 94%
Signs and shopfronts62563 95%
Loft or dormer59581 98%
New dwelling49435 90%
Trees and landscaping31291 97%
Two-storey extension28253 89%
Solar or heat pump25212 91%
Porch22220 100%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Guernsey

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to States of Guernsey planning register.

Who applies for permission here And who draws it up