Guernsey

Guernsey planning applications

3,350 applications from the island's planning register. Search by address, reference or what was proposed.

13 applications matching “ICART” in 2024

AddressProposalReferenceDecision
La Pierre Icart Road St. Martin Guernsey GY4 6JFRaise and alter roof and extend at 1st floor level, extend and alter at ground floor level, erect raised terrace area and pool to east (front) elevatiFULL/2024/0285Notification of Grant of Full Planning Permission.
La Pierre Icart Road St. Martin Guernsey GY4 6JFDemolish outbuilding, erect single storey summerhouse and alter ground levels, erect retaining walls and external steps to west boundary.FULL/2024/0286Notification of Refusal of Planning Permission.
Land at Icart Road St. Martin Guernsey GY4 6JGRemove section of earthbank, install substation, enclosure, fencing and associated works to south-east of site.FULL/2024/0730Notification of Grant of Full Planning Permission.
Icart Point Car Park Icart Road St. Martins Guernsey GY4 6JGInstall moveable catering trailer to east boundary of car park for temporary period (1st April 2025 - 30th September 2025)FULL/2024/0819Notification of Grant of Full Planning Permission.
Area of land formerly part of Hougue Ricart Quarry Clos Du Valle Vale Guernsey GY3 5LEErect structures on agricultural land (chicken cage, vegetable cage, play/climbing frame and goat shelter) (retrospective).FULL/2024/0850Notification of Grant of Full Planning Permission.
La Marcherie Route D'Icart St. Martin GuernseyErect pavilion and raised hardstanding/board-walk to north of site for a temporary 2 year period. Replace gate to west boundary (site of special signiFULL/2024/1148Application Withdrawn
Saints Farm Icart Road St. Martin Guernsey GY4 6JGRepair and replacement of windows to south, west and east elevations (Protected Building)FULL/2024/1169Notification of Grant of Full Planning Permission.
Saints Farm Icart Road St. Martin Guernsey GY4 6JGChange of use of agricultural land to domestic garden (1,476sqm) to east (rear) of property.FULL/2024/1247Application Withdrawn
Saints Farm Icart Road St. Martin Guernsey GY4 6Partially demolish conservatory, erect replacement conservatory to west elevation, install rooflights to east elevation, install cladding to north dorFULL/2024/1445Notification of Grant of Full Planning Permission.
Two Swallows Hougue Ricart Vale Guernsey GY3 5LDInstall replacement windows and doors.FULL/2024/1684Notification of Grant of Full Planning Permission.
Vue De Reve Icart Road St. Martin Guernsey GY4 6JGDemolish dwelling and detached garage and erect replacement dwelling with associated landscaping and alterations to vehicle accesses.FULL/2024/1719Notification of Grant of Full Planning Permission.
4 Le Clos Galliotte Icart Road St. Martin Guernsey GY4 6JDErect extension at 1st floor level to west (side) elevation.FULL/2024/1764Notification of Grant of Full Planning Permission.
La Boisselee Icart Road St. Martin Guernsey GY4 6JBErect single storey detached outbuilding to east boundary (site of a Protected Building).FULL/2024/1876Notification of Grant of Full Planning Permission.

What people apply for, and what gets approved

3,176 decided applications, grouped by what was being asked for. 93% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Extension83577051 94%
Walls, fences and access45540443 90%
Internal alterations40137516 96%
Demolish and rebuild29625733 89%
Garage, annexe or outbuilding29026321 93%
Windows and doors2502378 97%
Change of use17614520 88%
Roof works102982 98%
Garden building88785 94%
Signs and shopfronts62563 95%
Loft or dormer59581 98%
New dwelling49435 90%
Trees and landscaping31291 97%
Two-storey extension28253 89%
Solar or heat pump25212 91%
Porch22220 100%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Guernsey

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to States of Guernsey planning register.

Who applies for permission here And who draws it up