Guernsey planning applications

3,350 applications from the island's planning register. Search by address, reference or what was proposed.

8 applications matching “HAUTEVILLE” in 2024

AddressProposalReferenceDecision
Charnwood House 66 Hauteville St. Peter Port Guernsey GY1 1DQInstall Juliet balcony to east (rear) elevation and alterations to fenestration to west (front) and north (side) elevations.FULL/2024/0165Notification of Grant of Full Planning Permission.
The Cock & Bull 2 Lower Hauteville St. Peter Port GuernseyInstall mechanical extraction flue to north elevation of courtyard (retrospective), (revised scheme). (Protected Building).FULL/2024/0224Notification of Grant of Full Planning Permission.
40 Hauteville St. Peter Port Guernsey GY1 1DGDemolish external staircase, install spiral staircase and remove door and install window to south east (rear) elevation of building (Protected BuildinFULL/2024/0260Notification of Grant of Full Planning Permission.
Vue De L'Est Hauteville St. Peter Port Guernsey GY1 1DGAlterations and replacement balustrades to balconies to east (rear) elevation.FULL/2024/0619Notification of Grant of Full Planning Permission.
Parish Pump Hauteville St. Peter Port GuernseyRepair works to water pump (Protected Monument).FULL/2024/0832Notification of Grant of Full Planning Permission.
1 Lower Hauteville St. Peter Port GuernseyInstall replacement windows to east (front) elevation. (Protected Building).FULL/2024/0893Notification of Grant of Full Planning Permission.
65 Hauteville St. Peter Port Guernsey GY1 1DGErect dwelling and associated works and demolish section of wall to create vehicle access to south boundary.FULL/2024/1104Notification of Grant of Full Planning Permission.
36 Hauteville St. Peter Port Guernsey GY1 1DGInstall 4 roof lights to south east roof slope and 2 roof lights to north west roof slope (Protected Building).FULL/2024/1330Notification of Grant of Full Planning Permission.

What people apply for, and what gets approved

3,176 decided applications, grouped by what was being asked for. 93% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Extension83577051 94%
Walls, fences and access45540443 90%
Internal alterations40137516 96%
Demolish and rebuild29625733 89%
Garage, annexe or outbuilding29026321 93%
Windows and doors2502378 97%
Change of use17614520 88%
Roof works102982 98%
Garden building88785 94%
Signs and shopfronts62563 95%
Loft or dormer59581 98%
New dwelling49435 90%
Trees and landscaping31291 97%
Two-storey extension28253 89%
Solar or heat pump25212 91%
Porch22220 100%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.