Guernsey

Guernsey planning applications

3,350 applications from the island's planning register. Search by address, reference or what was proposed.

13 applications matching “HAUT” in 2023

AddressProposalReferenceDecision
Les Brehauts Farmhouse Route Du Longfrie St. Pierre Du Bois Guernsey GY7 9RXChange of use of 3 self-catering units (Visitor economy Use Class 8) to 3 dwellings with associated works (Residential Use Class 1).FULL/2023/1406Notification of Refusal of Planning Permission.
Les Hubits House Les Hubits De Haut St. Martin GuernseyErect single storey garden room/pool plant room to north boundary.FULL/2023/1722Notification of Grant of Full Planning Permission.
58a Hauteville St. Peter Port Guernsey GY1 1DQConvert games room/store to residential dwelling including raise and alter roof height and Juliet balcony to east elevation (Protected Building) (ReviFULL/2023/1777Notification of Refusal of Planning Permission.
La Remise Rue Des Brehauts St. Pierre Du Bois Guernsey GY7 9TNInstall replacement windows and doors to dwelling and replacement doors to outbuilding.FULL/2023/1779Notification of Grant of Full Planning Permission.
79 The Citadel Hautes Falaises Fort George St. Peter Port Guernsey GY1 2SXVariation to previously approved plans to extend at lower ground and ground floor level, install dormer window and balcony at first floor level to souFULL/2023/1997Notification of Grant of Full Planning Permission.
Kinnear Cottage Rohais De Haut St. Andrew Guernsey GY6 8YXReplace door to south-east (side) elevation, (retrospective). (Protected Building).FULL/2023/2012Notification of Grant of Full Planning Permission.
The Knoll Rohais De Haut St. Andrew Guernsey GY6 8SSErect summerhouse, hard surfacing and sunken seating area to east of property (Retrospective).FULL/2023/2117Notification of Grant of Full Planning Permission.
Haut Pave Rue De La Douzaine Fort George St. Peter Port Guernsey GY1 2TARaise roof ridge height to create accommodation at first floor level and erect single storey extension to north-west (side) elevation.FULL/2023/2147Notification of Grant of Full Planning Permission.
52-54 Hauteville St. Peter Port Guernsey GY1 1DGAlterations to fenestration (south-east elevation) and internal alterations (Protected Building).FULL/2023/2222Notification of Grant of Full Planning Permission.
Pandora Hotel Hauteville St. Peter Port Guernsey GY1 1DGInstall replacement flat roof and fenestration to south-east (rear) elevation (Protected Building).FULL/2023/2335Notification of Grant of Full Planning Permission.
La Remise Rue Des Brehauts St. Pierre Du Bois Guernsey GY7 9SDDemolish detached conservatory, erect detached outbuilding to north-east boundary.FULL/2023/2373Notification of Grant of Full Planning Permission.
Mardi 11 Hauteville St. Peter Port Guernsey GY1 1DHInstall replacement front door (east elevation) (Protected Building).FULL/2023/2404Notification of Grant of Full Planning Permission.
Haut Regard Hougue St. Clair Route De St. Clair St. Sampson Guernsey GY2 4DTRe-roofing of dwelling house with slate (Protected Building).FULL/2023/2459Notification of Grant of Full Planning Permission.

What people apply for, and what gets approved

3,176 decided applications, grouped by what was being asked for. 93% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Extension83577051 94%
Walls, fences and access45540443 90%
Internal alterations40137516 96%
Demolish and rebuild29625733 89%
Garage, annexe or outbuilding29026321 93%
Windows and doors2502378 97%
Change of use17614520 88%
Roof works102982 98%
Garden building88785 94%
Signs and shopfronts62563 95%
Loft or dormer59581 98%
New dwelling49435 90%
Trees and landscaping31291 97%
Two-storey extension28253 89%
Solar or heat pump25212 91%
Porch22220 100%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Guernsey

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to States of Guernsey planning register.

Who applies for permission here And who draws it up