Guernsey

Guernsey planning applications

3,350 applications from the island's planning register. Search by address, reference or what was proposed.

14 applications matching “ESPLANADE” in 2024

AddressProposalReferenceDecision
St. George's Esplanade St. Peter Port Guernsey GY1 2BGVariation to previously approved plans to erect signage to north (front) elevation - relocate sign to top of wall.FULL/2024/0375Notification of Refusal of Planning Permission.
Mill House St. George's Esplanade St. Peter Port Guernsey GY1 2BGErect signage at high-level to east wall of building.FULL/2024/0427Notification of Refusal of Planning Permission.
Flat 41 St Georges Esplanade St. Peter Port Guernsey GY1 2BPDemolish 2 chimneys to south boundary.FULL/2024/0519Notification of Grant of Full Planning Permission.
QE2 Marina Salerie Fuel Station La Salerie Quay Glategny Esplanade St. Peter Port Guernsey GY1 2BPErect 2 signs to railings (South Quay side).FULL/2024/0565Notification of Grant of Full Planning Permission.
15 & 16 Glategny Esplanade St. Peter Port Guernsey GY1 1WNDemolish existing building, erect 16 flats and ground floor office unit with associated vehicle access and parking (Revised Scheme).FULL/2024/0801Notification of Grant of Full Planning Permission.
Waffle House The Weighbridge North Esplanade St. Peter Port Guernsey GY1 1WGInstall a movable catering trailer (for temporary period of 1 year).FULL/2024/0905Notification of Grant of Full Planning Permission.
R W Randall Limited St. Georges Place St. George's Esplanade St. Peter Port Guernsey GY1 2BHInstall replacement antenna to existing mast to north elevation of building.FULL/2024/1055Notification of Grant of Full Planning Permission.
Mill House St. George's Esplanade St. Peter Port Guernsey GY1 2BGErect signage at high-level to east wall of building (revised scheme).FULL/2024/1105Notification of Grant of Full Planning Permission.
The Penthouse Lansdowne St. George's Esplanade St. Peter Port Guernsey GY1 2BHInstall and alter balustrade to north-east elevation.FULL/2024/1285Notification of Grant of Full Planning Permission.
North Beach Glategny Esplanade St. Peter Port Guernsey GY1 2BPInstall 6 cycle hoops.FULL/2024/1309Notification of Grant of Full Planning Permission.
Harbour House South Esplanade St. Peter Port Guernsey GY1 1APInstall rooflight to east (front) elevation.FULL/2024/1315Notification of Grant of Full Planning Permission.
32 Glategny Esplanade St. Peter Port Guernsey GY1 1WRChange of use from Estate Agents (Use Class 15) to General Retail (Use Class 10) (Retrospective).FULL/2024/1399Notification of Grant of Full Planning Permission.
Esplanade House 29 Glategny Esplanade St. Peter Port Guernsey GY1 1WRAlterations and repairs to flat roof, parapet and rooflights, repair and refurbish windows, doors and dormer windows. Install replacement air conditioFULL/2024/1840Notification of Grant of Full Planning Permission.
1 York House South Esplanade St. Peter Port Guernsey GY1 1ANErect gates to west elevation.FULL/2024/1969Notification of Grant of Full Planning Permission.

What people apply for, and what gets approved

3,176 decided applications, grouped by what was being asked for. 93% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Extension83577051 94%
Walls, fences and access45540443 90%
Internal alterations40137516 96%
Demolish and rebuild29625733 89%
Garage, annexe or outbuilding29026321 93%
Windows and doors2502378 97%
Change of use17614520 88%
Roof works102982 98%
Garden building88785 94%
Signs and shopfronts62563 95%
Loft or dormer59581 98%
New dwelling49435 90%
Trees and landscaping31291 97%
Two-storey extension28253 89%
Solar or heat pump25212 91%
Porch22220 100%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Guernsey

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to States of Guernsey planning register.

Who applies for permission here And who draws it up