Guernsey

Guernsey planning applications

3,350 applications from the island's planning register. Search by address, reference or what was proposed.

13 applications matching “BY” in 2026

AddressProposalReferenceDecision
Land formerly part of Rouge La Maison Au Compte Vale Guernsey GY3 5HEChange of use of agricultural land to domestic garden (1,553sqm), erect 2 storey outbuilding/garage/hobby room to north-east of site, demolish boundarFULL/2026/0197PENDING
Lower Cemetery Rue Du Presbytere Castel GuernseyErect replacement shed/outbuilding to south-east boundary.FULL/2026/0258Notification of Grant of Full Planning Permission.
Chateau De La Montagne La Charroterie St. Peter Port Guernsey GY1 1EJVariation to plans previously approved for Change of Use from House of Multiple Occupancy (Use Class 6) to 3 Residential Dwellings (Use Class 1) incluFULL/2026/0295Notification of Grant of Full Planning Permission.
Chateau De La Montagne La Charroterie St. Peter Port Guernsey GY1 1EJVariation to plans previously approved for Change of Use from House of Multiple Occupancy (Use Class 6) to 3 Residential Dwellings (Use Class 1) incluFULL/2026/0296Notification of Grant of Full Planning Permission.
Las Vegas & L'Estocquet La Jaonneuse Road Pembroke Vale Guernsey GY3 5BYChange of use of agricultural land to domestic garden (5,075sqm).FULL/2026/0321PENDING
The Laurels Candie Road St. Peter Port Guernsey GY1 1UPDemolish existing outbuilding, erect single storey outbuilding (garden/hobby room) to south-west boundary (site of a Protected Building).FULL/2026/0395Notification of Grant of Full Planning Permission.
Le Pollet St. Peter Port GuernseyInstall 2 benches to Le Pollet area (including by Parish pump) (Protected Monument).FULL/2026/0439Notification of Grant of Full Planning Permission.
Elysium Fort Road St. Peter Port Guernsey GY1 1ZUVariation to plans previously approved to demolish extension, erect 2 storey and single storey extension, raised terrace area and swimming pool to wesFULL/2026/0579Notification of Grant of Full Planning Permission.
St Marie du Castel (Castel Parish Church) La Rue Du Presbytere Castel Guernsey GY5 7NERepair works to north aisle including internal re-plastering (Protected Building).FULL/2026/0663Notification of Grant of Full Planning Permission.
Vivanta Delancey Lane St. Sampson Guernsey GY2 4BYVariation to previously approved plans to erect garden room/store to west boundary to enable use as an ancillary living unit.FULL/2026/0702Notification of Grant of Full Planning Permission.
Made by Fairies Mansell Street St. Peter Port Guernsey GY1 1HPChange of use of ground floor from Tattoo parlour (Sui-Generis use) to bakery (Use Class 9).FULL/2026/0770Notification of Grant of Full Planning Permission.
The Children's Pool La Vallette St. Peter Port Guernsey GY1 1AXRepairs to slipway by Children's bathing pool.FULL/2026/0808Notification of Grant of Full Planning Permission.
Royal Guernsey Golf Club La Jaonneuse Road Pembroke Vale Guernsey GY3 5BYInstall external lift and alterations to fenestration to south west elevation.FULL/2026/1176PENDING

What people apply for, and what gets approved

3,176 decided applications, grouped by what was being asked for. 93% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Extension83577051 94%
Walls, fences and access45540443 90%
Internal alterations40137516 96%
Demolish and rebuild29625733 89%
Garage, annexe or outbuilding29026321 93%
Windows and doors2502378 97%
Change of use17614520 88%
Roof works102982 98%
Garden building88785 94%
Signs and shopfronts62563 95%
Loft or dormer59581 98%
New dwelling49435 90%
Trees and landscaping31291 97%
Two-storey extension28253 89%
Solar or heat pump25212 91%
Porch22220 100%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Guernsey

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to States of Guernsey planning register.

Who applies for permission here And who draws it up