Guernsey planning applications
3,350 applications from the island's planning register. Search by address, reference or what was proposed.
13 applications matching “99” in 2026
| Address | Proposal | Reference | Decision |
|---|---|---|---|
| La Falaise Rue De La Falaise St. Martin Guernsey GY4 6UN | Alteration to bay window fenestration to south-east (rear) elevation (Protected Building). | FULL/2026/0099 | Notification of Grant of Full Planning Permission. |
| Les Plataines Mont D`Aval Castel Guernsey GY5 7UQ | Change of use of part of dwelling for use as a dog boarding business. | FULL/2026/0199 | Notification of Grant of Full Planning Permission. |
| Land at Pitronnerie Road Le Grand Bouet St. Peter Port Guernsey | Change of use of land for the temporary parking of buses and commercial vehicles (temporary period of 2 years). | FULL/2026/0499 | Notification of Grant of Full Planning Permission. |
| The Haven Portinfer Road Vale Guernsey GY6 8LL | Erect single storey outbuilding and covered area to north-west of property. | FULL/2026/0599 | Notification of Grant of Full Planning Permission. |
| Unit 10 La Chaumiere Rue Piette Castel Guernsey GY5 7AD | Erect single storey extension to south (rear) elevation to Unit 10. | FULL/2026/0899 | Notification of Grant of Full Planning Permission. |
| Maison Couture La Route Des Coutures St. Martin Guernsey GY4 6HJ | Convert domestic outbuilding to a dwelling and associated works. | FULL/2026/0991 | PENDING |
| La Poumare Les Pages St. Martin Guernsey GY4 6QU | Extend and alter dormer window to north (side) elevation. | FULL/2026/0992 | Notification of Grant of Full Planning Permission. |
| Castle Cornet Castle Emplacement St. Peter Port Guernsey GY1 1AU | Install rock armour in gully between Castle Cornet and Havelet slipway for temporary period (1st September 2026 - 31 July 2027). | FULL/2026/0993 | Notification of Grant of Full Planning Permission. |
| Homeside Summerfield Road Vale Guernsey GY3 5UH | Demolish existing outbuilding, erect single storey ancillary outbuilding to south-east boundary, alter hardstanding to south of site (site of a Protec | FULL/2026/0994 | PENDING |
| No.6 Berth East Arm Walkway St. Peter Port Guernsey GY1 2LL | Install yacht mast storage racks to existing sea wall and erect fencing to east boundary of the East Breakwater. | FULL/2026/0995 | PENDING |
| Karuna 7 Les Puits Rue De La Perruque Castel Guernsey GY5 7PB | Remove hedge and erect fence to north of property and section to east (side) boundary. Demolish existing shed and erect replacement shed to east bound | FULL/2026/0996 | PENDING |
| Andalasia Grange Road St. Peter Port Guernsey GY1 2QH | Demolish chimney to north (rear) elevation, erect dormer window to north (rear) elevation, install rooflights to south (front) elevation and alteratio | FULL/2026/1099 | PENDING |
| Grandes Rocques Bistro Rue De La Saline Cobo Castel Guernsey GY5 7XG | Demolish extension, external staircase, remove chimney vents. Extend balcony at first floor level and alter wall to west (front) elevation, erect relo | FULL/2026/1199 | PENDING |
What people apply for, and what gets approved
3,176 decided applications, grouped by what was being asked for. 93% are granted overall — the interesting part is the spread.
| What was applied for | Decided | Granted | Refused | Success rate |
|---|---|---|---|---|
| Extension | 835 | 770 | 51 | 94% |
| Walls, fences and access | 455 | 404 | 43 | 90% |
| Internal alterations | 401 | 375 | 16 | 96% |
| Demolish and rebuild | 296 | 257 | 33 | 89% |
| Garage, annexe or outbuilding | 290 | 263 | 21 | 93% |
| Windows and doors | 250 | 237 | 8 | 97% |
| Change of use | 176 | 145 | 20 | 88% |
| Roof works | 102 | 98 | 2 | 98% |
| Garden building | 88 | 78 | 5 | 94% |
| Signs and shopfronts | 62 | 56 | 3 | 95% |
| Loft or dormer | 59 | 58 | 1 | 98% |
| New dwelling | 49 | 43 | 5 | 90% |
| Trees and landscaping | 31 | 29 | 1 | 97% |
| Two-storey extension | 28 | 25 | 3 | 89% |
| Solar or heat pump | 25 | 21 | 2 | 91% |
| Porch | 22 | 22 | 0 | 100% |
Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.
While you are here
Everything the data says about Guernsey
Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to States of Guernsey planning register.