Guernsey

Guernsey planning applications

3,350 applications from the island's planning register. Search by address, reference or what was proposed.

13 applications matching “29” in 2025

AddressProposalReferenceDecision
Val Au Bourg Saints Bay Road St. Martin Guernsey GY4 6Install air source heat pump to east elevation and install air source heat pump with acoustic fencing to west elevation.FULL/2025/0729Notification of Refusal of Planning Permission.
Belle Vaeue Rue Du Lorier St. Pierre Du Bois Guernsey GY7 9JUErect single storey extension with terrace at first floor level to north (rear) elevation.FULL/2025/0829Notification of Grant of Full Planning Permission.
La Maison Blanche Les Hubits St. Martin Guernsey GY4 6LUErect covered balcony at first floor level, install replacement rooflights and solar panels to south (rear), alteration to roof to east (side) elevatiFULL/2025/0929Notification of Grant of Full Planning Permission.
Rock Business Centre La Route Du Braye Vale Guernsey GY3 5PGVariation to previously approved plans to erect 18 light industrial units with associated parking and landscaping, alterations to vehicle access and eFULL/2025/1129Notification of Grant of Full Planning Permission.
Petite Lande Rue Des Monts Forest Guernsey GY8 0BBConvert, extend and alter building to create dwelling and associated works. Change of use of agricultural land to domestic garden (500sqm) (Revised scFULL/2025/1229Notification of Refusal of Planning Permission.
The Farm Rue Des Annevilles Vale Guernsey GY6 8LYConvert, extend and alter outbuilding to create a dwelling, change of use of agricultural land to domestic garden (200sqm) and associated works.FULL/2025/1290Notification of Refusal of Planning Permission.
La Croute De Haut Rue Des Pointes St. Andrew Guernsey GY6 8UJErect fence to south of dwelling (Retrospective) (Revised Scheme).FULL/2025/1329Notification of Grant of Full Planning Permission.
Land to the rear of Le Va La Route Du Braye Vale Guernsey GY3 5PBChange of use of land for storage and distribution (Use Class 22) and retain hard surfacing (retrospective).FULL/2025/1429Notification of Refusal of Planning Permission.
Ocean House North Plantation St. Peter Port Guernsey GY1 2LQChange of use of ground floor and part of 1st floor from General Retail (Use Class 10) to off-licence and wine tasting business.FULL/2025/1529Notification of Grant of Full Planning Permission.
La Maison Du Macareux Fosse Andre St. Peter Port Guernsey GY1 2DTChange of use of agricultural land to domestic garden (4,929sqm)FULL/2025/1641Notification of Grant of Full Planning Permission.
Abril Les Prins Lane Portinfer Road Vale Guernsey GY6 8HHChange of use of agricultural land to domestic garden (291sqm).FULL/2025/1804Notification of Grant of Full Planning Permission.
Longfrie Surgery Rue Du Longfrie St. Pierre Du Bois Guernsey GY7 9RZErect single storey extension to north elevation.FULL/2025/1929Notification of Grant of Full Planning Permission.
La Roseliere 29 Les Cherfs Estate Rue Des Corneilles Castel Guernsey GY5 7HGChange of use of agricultural land to domestic garden (825sqm).FULL/2025/1892PENDING

What people apply for, and what gets approved

3,176 decided applications, grouped by what was being asked for. 93% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Extension83577051 94%
Walls, fences and access45540443 90%
Internal alterations40137516 96%
Demolish and rebuild29625733 89%
Garage, annexe or outbuilding29026321 93%
Windows and doors2502378 97%
Change of use17614520 88%
Roof works102982 98%
Garden building88785 94%
Signs and shopfronts62563 95%
Loft or dormer59581 98%
New dwelling49435 90%
Trees and landscaping31291 97%
Two-storey extension28253 89%
Solar or heat pump25212 91%
Porch22220 100%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Guernsey

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to States of Guernsey planning register.

Who applies for permission here And who draws it up