3,350 applications from the island's planning register. Search by address, reference or what was proposed.

12 applications matching “28” in 2026

AddressProposalReferenceDecision
La Neuve Maison Mont D'Aval Castel Guernsey GY5 7UQDemolish domestic outbuilding (Use Class 1) and remove container to south of property, erect single storey agricultural building (Use Class 28) to souFULL/2026/0020Notification of Grant of Full Planning Permission.
Carfo Store Le Bouet St. Peter Port Guernsey GY1 2AWChange of use of building from storage and distribution (Use Class 34) to a dwelling and associated works (Protected Building).FULL/2026/0128Notification of Grant of Full Planning Permission.
Brehon 22 Jardin De Haut Mont Arrive St. Peter Port Guernsey GY1 2AHErect single storey extension to rear (east) elevation.FULL/2026/0281Notification of Grant of Full Planning Permission.
La Terre Norgiot Rue De La Terre Norgiot St. Saviour Guernsey GY7 9JWErect a balcony with associated alterations to fenestration and install a flue to front (east) gable wall.FULL/2026/0282Notification of Grant of Full Planning Permission.
Rose Cottage Collings Road St. Peter Port Guernsey GY1 1FPDemolish conservatory to rear (south elevation) and erect a single-storey extension to side and rear (south and east elevations).FULL/2026/0283Notification of Grant of Full Planning Permission.
M & S St Martins Grande Rue St. Martin GuernseyVariation to previously approved plans to erect temporary retail unit and portacabins (temporary staff facilities) to east of site. Erect 2m high fencFULL/2026/0284Notification of Grant of Full Planning Permission.
St Vincent Route De La Mare De Carteret Castel GuernseyConvert and alter ancillary domestic outbuilding (tractor store) to form a dwelling and associated works.FULL/2026/0628Notification of Refusal of Planning Permission.
Land at Rue De La Villiaze Forest Guernsey GY8 0HJDemolish existing building and erect agricultural building (Use Class 28) to west boundary and installation of solar panels to the roof of the buildinFULL/2026/0657Notification of Grant of Full Planning Permission.
Creaseys Limited 15-21 High Street / The Quay St. Peter Port Guernsey GY1 2JZErect 3 signs to west elevation (1 illuminated) and 1 sign to east elevation (Protected Building).FULL/2026/0728PENDING
La Tranquille Douit Lane Vale Guernsey GY6 8AARaise roof ridge height, extend and alter to create accommodation at first floor level and alteration to fenestration.FULL/2026/0928Notification of Grant of Full Planning Permission.
Bas Sejour Barn Ruette De Fries Castel GuernseyConvert barn to residential dwelling (Use Class 1), change of use of agricultural land (use class 28) to domestic garden (548sqm). Install rooflights FULL/2026/1109PENDING
Airport Access Rue Des Landes Forest GuernseyInstall replacement enclosed substation and associated works.FULL/2026/1128PENDING

What people apply for, and what gets approved

3,176 decided applications, grouped by what was being asked for. 93% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Extension83577051 94%
Walls, fences and access45540443 90%
Internal alterations40137516 96%
Demolish and rebuild29625733 89%
Garage, annexe or outbuilding29026321 93%
Windows and doors2502378 97%
Change of use17614520 88%
Roof works102982 98%
Garden building88785 94%
Signs and shopfronts62563 95%
Loft or dormer59581 98%
New dwelling49435 90%
Trees and landscaping31291 97%
Two-storey extension28253 89%
Solar or heat pump25212 91%
Porch22220 100%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Guernsey

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to States of Guernsey planning register.

Who applies for permission here And who draws it up