Jersey

Jersey planning applications

3,402 applications from the island's planning register. Search by address, reference or what was proposed.

6 applications matching “Flat 1” in 2026

AddressProposalReferenceDecision
7 Hilary Street, Flat 1, Flat 1, St. HelierRe-construct section of collapsed granite wall, repair outbuilding and carry out associated Building works.P/2026/11200Approved
La Route de St. Aubin, Flat 1 Vernon House, Flat 1 Vernon House, St. HelierInstall electrical boiler and cable.P/2026/11097Approved
Victoria Avenue, Flat 1 Ocean View, Flat 1 Ocean View, St. LawrenceConvert existing garage into habitable. Install Air Source Heat Pump (ASHP) to West Elevation & new entrance gates to South of site.P/2026/11062Approved
2 Queens Road, Flat 1, Flat 1, St. HelierReplace 1No. window to East elevation.RW/2026/10877Approved
7 Clarence Road, Flat 1 Landfield House, Flat 1 Landfield House, St. HelierReplace 3no. windows to South elevation.RW/2026/10813Approved
1 Waverley Terrace, Flat 1, Flat 1, St. SaviourReplace first floor window on South elevation.RW/2026/10560Approved

What people apply for, and what gets approved

3,221 decided applications, grouped by what was being asked for. 89% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Internal alterations72964752 93%
Extension57849168 88%
Windows and doors33230620 94%
Demolish and rebuild25621129 88%
Walls, fences and access23119032 86%
Garage, annexe or outbuilding19516326 86%
Roof works18816611 94%
Two-storey extension17214323 86%
Change of use1199517 85%
Loft or dormer77688 89%
Signs and shopfronts75704 95%
Garden building745813 82%
New dwelling684814 77%
Trees and landscaping625012 81%
Swimming pool25214 84%
Porch20155 75%
Solar or heat pump20181 95%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Jersey

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to Government of Jersey planning applications.

Who applies for permission here And who draws it up