Malta planning applications
5,731 applications from the island's planning register. Search by address, reference or what was proposed.
5 applications matching “No.4, Triq”
| Address | Proposal | Reference | Decision |
|---|---|---|---|
| St Margaret Flats, Flat no.4, Triq Vincenzo Caruana Spiteri, Sannat | Extension at receded floor, which includes the construction of roof slab and parapet wall. | PA/04881/23 | Filed 2023 |
| St Margaret Flats, Flat no.4, Triq Vincenzo Caruana Spiteri, Sannat | To sanction the opening of new apertures from approved permit PA4881/23. | PA/08650/24 | Filed 2024 |
| No.9, Sqaq No.4, Triq il-Parocca, Mqabba | To propose internal alterations at ground floor level, extension to dwelling at first floor level to include a third bedroom and bathroom together wit | PA/08686/24 | Filed 2024 |
| No.4, Triq Santa Lucija, Naxxar | Proposed replacement of ground floor facade, demolition of second floor structures and construction of staircase and study room with terrace and jacuz | PA/06667/24 | Filed 2024 |
| 35, Penthouse No.4, Triq Axtart, Marsaxlokk | Sanctioning of existing penthouse not constructed as per PA/07862/21, and retractable canopy. | PA/04339/26 | Filed 2026 |
While you are here
Supply
What is the cheap end of Malta actually like?
Only 833 of 7,690 homes for sale — 10.8% — ask €200,000 or less. The bottom of this market is thinner than most people expect.
What would make this wrong: Cheap homes sell fastest, so at any moment the bottom of the market is under-represented on any listings site, including this one.
See what this is built from
Renting out
Where does renting out pay best in Malta?
Floriana shows the widest gap between rents and prices at 10.6% gross, against 4.4% island-wide.
See what this is built from
This week
What has moved in Malta this week?
9,499 listings appeared, 28 had their price cut and 42 went up. We read every agent's site overnight, so this is the week as it happened.
See what this is built from
Everything the data says about Malta
More ways into Malta
Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to Planning Authority (Malta).