Malta planning applications
5,731 applications from the island's planning register. Search by address, reference or what was proposed.
5 applications matching “No.2, Triq”
| Address | Proposal | Reference | Decision |
|---|---|---|---|
| Bibi Residences No.2, Triq it-Tabib Anton Tabone, Rabat (Gozo) | To propose relocation of the St. George’s statue replica to a different location on the facade and other alterations to the facade. | PA/01299/24 | Filed 2024 |
| Ta Gandolf, Garage no.2, Triq Mary Mejlak, Rabat (Gozo) | To renew permission PA8322/19 - To change in use from garage to Class 4B, carry out minor internal alterations and add sign. | PA/00474/25 | Filed 2025 |
| No.2, Triq Abdosir c/w, Triq tas-Silg, Marsaxlokk | Proposed minor internal and external alterations at second, third and setback floor levels. | PA/04612/23 | Filed 2023 |
| No.2, Triq Tonin Attard, Marsaxlokk | Proposed installation of lift as well as alterations to existing first and second floor dwellings which includes displacement of walls and apertures. | PA/03364/24 | Filed 2024 |
| Bitha Guzeppi Farrugia, No.2, Triq Guzeppi Decelis, Vittoriosa (Birgu) | To sanction garages and driveway as built. | PA/07459/23 | Filed 2023 |
While you are here
Supply
What is the cheap end of Malta actually like?
Only 833 of 7,690 homes for sale — 10.8% — ask €200,000 or less. The bottom of this market is thinner than most people expect.
What would make this wrong: Cheap homes sell fastest, so at any moment the bottom of the market is under-represented on any listings site, including this one.
See what this is built from
Renting out
Where does renting out pay best in Malta?
Floriana shows the widest gap between rents and prices at 10.6% gross, against 4.4% island-wide.
See what this is built from
This week
What has moved in Malta this week?
9,499 listings appeared, 28 had their price cut and 42 went up. We read every agent's site overnight, so this is the week as it happened.
See what this is built from
Everything the data says about Malta
More ways into Malta
Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to Planning Authority (Malta).