Jersey

Jersey planning applications

3,402 applications from the island's planning register. Search by address, reference or what was proposed.

4 applications matching “Undercliffe Lodge,”

AddressProposalReferenceDecision
Undercliffe Lodge, Undercliffe Road, St. HelierConvert 2 No. First Floor Residential Lodging Units to 1 No. Residential Lodging Unit.P/2024/0900Approved
Undercliffe Lodge, Undercliffe Road, St. HelierCreate first floor roof terrace and Increase size of 2 No. first floor windows to South Elevation. AMENDED DRAWINGS.P/2024/0899Approved
Undercliffe Lodge, Undercliffe Road, St. HelierWiden existing vehicular access onto Undercliffe Road and locally repair existing granite roadside retaining wall. Reconfigure garden retaining walls P/2024/0732Approved
Undercliffe Lodge, Undercliffe Road, St. HelierWiden existing vehicular access on to Undercliffe Road and rebuild granite roadside retaining wall in rendered blockwork. Reconfigure garden retainingP/2024/0430Refused

What people apply for, and what gets approved

3,221 decided applications, grouped by what was being asked for. 89% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Internal alterations72964752 93%
Extension57849168 88%
Windows and doors33230620 94%
Demolish and rebuild25621129 88%
Walls, fences and access23119032 86%
Garage, annexe or outbuilding19516326 86%
Roof works18816611 94%
Two-storey extension17214323 86%
Change of use1199517 85%
Loft or dormer77688 89%
Signs and shopfronts75704 95%
Garden building745813 82%
New dwelling684814 77%
Trees and landscaping625012 81%
Swimming pool25214 84%
Porch20155 75%
Solar or heat pump20181 95%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Jersey

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to Government of Jersey planning applications.

Who applies for permission here And who draws it up