Jersey

Jersey planning applications

3,402 applications from the island's planning register. Search by address, reference or what was proposed.

8 applications matching “Albert Pier,”

AddressProposalReferenceDecision
St. Helier Marina, Albert Pier, Albert Pier, St. HelierContinue the use of an existing temporary car park on Albert Pier for 3 years.P/2026/11076Approved
Albert Pier, Albert Quay, Albert Quay, St. HelierRemove existing and replace with new bankseat. Install new pontoons. Associated works to Albert Pier, including creation of temporary storage /compounP/2026/11033Approved
St Helier Harbour, Albert Pier, Albert Pier, St. HelierReplace and extend existing deteriorating zinc gutter and downpipe with new aluminium gutter and downpipe to façade.P/2025/10187Approved
Albert Pier, No 1 Bankseat, No 1 Bankseat, St HelierDemolish existing and construct new platform and bankseat, install pontoons and guideline. Various ancillary works to include barriers and fencing.P/2025/0685Withdrawn
Albert Pier, La Route du Port Elizabeth, St. HelierIntrusive structural site investigation works to pier.P/2025/0116Approved
Lifeboat Cafe, Albert Pier, St. HelierRETROSPECTIVE: Add ventilation extract and ducts to roof of approved café and move building to allow disabled access behind.P/2023/1318Approved
Jersey Harbours, St. Helier Marina, Albert Pier, St. HelierConstruct 6 no. 1-bed pontoon accommodation in St Helier marina to South West wallP/2023/1081Approved
Albert Quay, Albert Pier, St. HelierChange of use of part of Albert Pier to provide temporary parking area for a 36 month period.P/2023/1080Approved

What people apply for, and what gets approved

3,221 decided applications, grouped by what was being asked for. 89% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Internal alterations72964752 93%
Extension57849168 88%
Windows and doors33230620 94%
Demolish and rebuild25621129 88%
Walls, fences and access23119032 86%
Garage, annexe or outbuilding19516326 86%
Roof works18816611 94%
Two-storey extension17214323 86%
Change of use1199517 85%
Loft or dormer77688 89%
Signs and shopfronts75704 95%
Garden building745813 82%
New dwelling684814 77%
Trees and landscaping625012 81%
Swimming pool25214 84%
Porch20155 75%
Solar or heat pump20181 95%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Jersey

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to Government of Jersey planning applications.

Who applies for permission here And who draws it up