Jersey

Jersey planning applications

3,402 applications from the island's planning register. Search by address, reference or what was proposed.

7 applications matching “9, La”

AddressProposalReferenceDecision
Field No. S99, La Route de Maufant, St. SaviourDemolish 15m replica telegraph pole, 3 No. antennas, 1 No. dish and 3 No. equipment cabinets. Erect 15m slimline lattice tower with 6 No. antennas andS/2025/0680Approved
Field No. O369, La Rue du Mont Capel, St. OuenRETROSPECTIVE - Construct an agricultural shedP/2024/1407Approved
39, La Ville du Bocage, St. PeterDemolish detached single garage and stores. Construct single storey extension to South East Elevation. Alter vehicular access on to La Ville du BocageP/2024/1062Approved
19, La Ville du Bocage, St. PeterConstruct first floor pitched roof extension to East Elevation.P/2024/0713Approved
9, La Maudelaine Estate, St. BreladeIncrease height of roadside boundary wall to South of site. REVISED PLANS REC'D: Alter wall position and reduce height.P/2024/0454Approved
Field J1109, La Grande Route De St. Jean, St. JohnConstruct 38 new affordable homes, comprising 3 x 2-bed, 32 x 3-bed and 3 x 4-bed dwellings, with associated parking and gardens, plus new vehicle andP/2024/0050Approved
Field No. S409, La Rue des Friquettes, St. SaviourRETROSPECTIVE: Repositioned access to Field No S409P/2023/0843Approved

What people apply for, and what gets approved

3,221 decided applications, grouped by what was being asked for. 89% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Internal alterations72964752 93%
Extension57849168 88%
Windows and doors33230620 94%
Demolish and rebuild25621129 88%
Walls, fences and access23119032 86%
Garage, annexe or outbuilding19516326 86%
Roof works18816611 94%
Two-storey extension17214323 86%
Change of use1199517 85%
Loft or dormer77688 89%
Signs and shopfronts75704 95%
Garden building745813 82%
New dwelling684814 77%
Trees and landscaping625012 81%
Swimming pool25214 84%
Porch20155 75%
Solar or heat pump20181 95%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Jersey

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to Government of Jersey planning applications.

Who applies for permission here And who draws it up