Isle of Man

Isle of Man planning applications

4,893 applications from the island's planning register. Search by address, reference or what was proposed.

5 applications matching “The Old” in 2023

AddressProposalReferenceDecision
THE OLD HOUSE, COLLEGE GREEN, CASTLETOWN, ISLE OF MAN, IM9 1BEInformation in relation to Condition 2 for PA 22/01463/B for a schedule of finishes23/10093/AIRPermitted
VILLAGE FIREPLACES & STOVES LTD, THE OLD WOOL EXCHANGE, PEEL ROAD, DOUGLAS, ISLE OF MAN, IM1 4LXReplace the roof finish23/01291/BPermitted
THE OLD POLICE STATION, STRAND ROAD, PORT ERIN, ISLE OF MAN, IM9 6HBReplacement of existing timber frame windows with new timber effect heritage style windows to the front and side elevations23/00825/BPermitted
OLD PRIMARY SCHOOL, KIONSLIEU HILL, FOXDALE, ISLE OF MAN, IM4 3HBProposed demolition of the old school house and construction of two new semi-detached dwellings23/01164/BPermitted
THE OLD SCHOOL HOUSE, MAIN ROAD, SULBY, ISLE OF MAN, IM7 2HPRegistered Building Consent for repositioning of staircase, alteration of ground and first floor plans, and creation of mezzanine floor - RB 17123/01159/CONPermitted

What people apply for, and what gets approved

4,594 decided applications, grouped by what was being asked for. 92% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Internal alterations1,5111,305156 89%
Extension84077344 95%
Windows and doors67363530 95%
Garage, annexe or outbuilding37432438 90%
Roof works2222126 97%
Walls, fences and access20216920 89%
Change of use1481357 95%
Trees and landscaping13211610 92%
Two-storey extension1018414 86%
Garden building85795 94%
Loft or dormer817011 86%
Signs and shopfronts70653 96%
Porch55541 98%
Solar or heat pump38352 95%
New dwelling33257 78%
Demolish and rebuild27261 96%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Isle of Man

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to Isle of Man planning applications.

Who applies for permission here And who draws it up