Isle of Man

Isle of Man planning applications

4,893 applications from the island's planning register. Search by address, reference or what was proposed.

4 applications matching “CAR PARK” in 2026

AddressProposalReferenceDecision
CAR PARK ADJACENT MUCKLES GATE, LORD STREET, DOUGLAS, ISLE OF MAN, IM1 2BDConversion of existing public space to wellness retreat with erection of ablution block, pools, sauna and ancillary facilities with associated landsca26/00467/BPermitted
CASINO, PALACE BUILDINGS, CENTRAL PROMENADE, DOUGLAS, ISLE OF MAN, IM2 4NAInstallation of projector and power units on car park wall and projection of illuminated sign onto the south western elevation of the Best Western Pal26/00178/DPermitted
LAND BETWEEN THE RIVER DOUGLAS AND, LAKE ROAD, DOUGLAS, ISLE OF MAN, IM1 5AFMinor Changes to PA 24/00310/B involving changes to PV panels, window/door positions and styles, through access, bin store/bike storage area location,26/00441/MCHpending
BOTTLENECK CAR PARK, LOCH PROMENADE, DOUGLAS, ISLE OF MAN, IM1 2BTTemporary change of use from car park to food and drink festival from 25 May to 7 June 202626/00220/CPermitted

What people apply for, and what gets approved

4,594 decided applications, grouped by what was being asked for. 92% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Internal alterations1,5111,305156 89%
Extension84077344 95%
Windows and doors67363530 95%
Garage, annexe or outbuilding37432438 90%
Roof works2222126 97%
Walls, fences and access20216920 89%
Change of use1481357 95%
Trees and landscaping13211610 92%
Two-storey extension1018414 86%
Garden building85795 94%
Loft or dormer817011 86%
Signs and shopfronts70653 96%
Porch55541 98%
Solar or heat pump38352 95%
New dwelling33257 78%
Demolish and rebuild27261 96%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Isle of Man

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to Isle of Man planning applications.

Who applies for permission here And who draws it up