Guernsey

Guernsey planning applications

3,350 applications from the island's planning register. Search by address, reference or what was proposed.

5 applications matching “The Grange” in 2024

AddressProposalReferenceDecision
Healthspan House The Grange St. Peter Port Guernsey GY1 2QHErect car port in centre of car park with solar panels to roof.FULL/2024/0307Notification of Grant of Full Planning Permission.
Ozanne Building Elizabeth College Site The Grange St. Peter Port Guernsey GY1 2PYInstall vents and grilles and replacement windows to Ozanne building (Site of a Protected Building).FULL/2024/1397Notification of Grant of Full Planning Permission.
Esperance The Grange St. Peter Port Guernsey GY1 1RHChange of use of section of building (ground floor, first floor and second floor) to 3 residential flats/bedsits (Residential Use Class 2). AlterationFULL/2024/1604Notification of Grant of Full Planning Permission.
Victoria Court The Grange St. Peter Port Guernsey GY1 1RHInstall four replacement windows to south elevation (Protected Building).FULL/2024/1616Notification of Grant of Full Planning Permission.
Unit 4 Grange Mews The Grange St. Peter Port GuernseyErect single storey extension to west (rear) of Unit 4.FULL/2024/2116Notification of Grant of Full Planning Permission.

What people apply for, and what gets approved

3,176 decided applications, grouped by what was being asked for. 93% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Extension83577051 94%
Walls, fences and access45540443 90%
Internal alterations40137516 96%
Demolish and rebuild29625733 89%
Garage, annexe or outbuilding29026321 93%
Windows and doors2502378 97%
Change of use17614520 88%
Roof works102982 98%
Garden building88785 94%
Signs and shopfronts62563 95%
Loft or dormer59581 98%
New dwelling49435 90%
Trees and landscaping31291 97%
Two-storey extension28253 89%
Solar or heat pump25212 91%
Porch22220 100%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Guernsey

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to States of Guernsey planning register.

Who applies for permission here And who draws it up