Bermuda

Bermuda planning applications

2,743 applications from the island's planning register. Search by address, reference or what was proposed.

6 applications matching “4 Tribe”

AddressProposalReferenceDecision
4 Tribe Road No 6, SouthamptonProposed Addition Revised to Create 3rd Unit, New Hipped Roof. Remove Pump Room and Steps.P0270‑25Final Approval
14 Tribe Lane, DevonshireConvert Existing Single Family Home into A Studio Unit and A Two Bedroom Unit (Totalling 2 Units), 2 New BELCO MetersP0170‑25Final Approval
Ian MacIntyre, 4 Tribe Road No 1, PagetProposed Roof Mounted Solar PV System – 9 Panels, 177 sq. ft., System Capacity: 3.285kw.P0293‑23Final Approval
Trevor Mills, 4 Tribe Road No 6, SouthamptonProposed Additions and Alterations to Existing Residence to Create New Dwelling Unit (3 Units Total), Covered Porch and Balcony with New Communal ParkP0018‑23Final Approval
4 Tribe Road No 6, SandysProposed Relinquishing 3.05m Right of Way servicing No. 8 Tribe Road No. 6 and Boundary Adjustment Between No. 4 Tribe Road No. 6 and No. 8 Tribe RoadS0037‑21Final Approval
24 Tribe Road No 6, SandysProposed Renovations and Additions to Existing House to Create Third Bedroom, Garage and Master Bedroom Closet.PLAN‑0234‑20Final Approval

What people apply for

2,725 decided applications, grouped by what was being asked for. The copy of Bermuda's register we hold records approvals but almost no refusals (0 in 2,725), so there is no honest success rate to publish here — only what is being built.

What was applied forDecidedGrantedRefused
Internal alterations8428420
Walls, fences and access5525520
Garage, annexe or outbuilding2312310
Roof works1951950
Extension1781780
Swimming pool1621620
Porch1231230
Change of use1131130
Garden building86860
Windows and doors72720
Solar or heat pump57570
New dwelling50500
Demolish and rebuild32320

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Bermuda

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to Government of Bermuda Department of Planning.

Who applies for permission here