Isle of Man

Isle of Man planning applications

4,893 applications from the island's planning register. Search by address, reference or what was proposed.

9 applications matching “LORNE HOUSE,”

AddressProposalReferenceDecision
LORNE HOUSE, DOUGLAS STREET, CASTLETOWN, ISLE OF MAN, IM9 1AZRegistered Building Consent for internal and external alterations including external door and window alterations, new external soil and rainwater pipe22/01524/CONPermitted
LORNE HOUSE, DOUGLAS STREET, CASTLETOWN, ISLE OF MAN, IM9 1AZConstruction of retaining walls and terrace on west elevation (in association with RB consent application 24/00529/CON)24/00527/GBPermitted
LORNE HOUSE, DOUGLAS STREET, CASTLETOWN, ISLE OF MAN, IM9 1AZConstruct a tennis court in the garden North West side of the house; Construct a soakaway in the south garden23/00468/BPermitted
LORNE HOUSE, DOUGLAS STREET, CASTLETOWN, ISLE OF MAN, IM9 1AZAlterations including replacement doors on north east wing, replacement of existing back door with window, new soil and rainwater pipes and replacemen22/01523/GBPermitted
LORNE HOUSE, DOUGLAS STREET, CASTLETOWN, ISLE OF MAN, IM9 1AZRegistered building consent for construction of retaining wall and terrace on west elevation RB 269 (in association with 24/00527/GB)24/00529/CONPermitted
LORNE HOUSE, DOUGLAS STREET, CASTLETOWN, ISLE OF MAN, IM9 1AZInformation in relation to Condtion 2 & 3 for PA 22/01524/CON for details of work and the schedule of materials, finishes and samples to be used.23/10058/AIRPermitted
LORNE HOUSE, DOUGLAS STREET, CASTLETOWN, ISLE OF MAN, IM9 1AZInformation in relation to Condition 2 & 3 for PA 22/01523/GB for details of work and the schedule of materials, finishes and samples to be used.23/10057/AIRPermitted
LORNE HOUSE, DOUGLAS STREET, CASTLETOWN, ISLE OF MAN, IM9 1AZRegistered building consent for alterations to previous approved applications including: removal of modern stone garden wall; formation of new gateway26/00648/CONpending
LORNE HOUSE, DOUGLAS STREET, CASTLETOWN, ISLE OF MAN, IM9 1AZAlterations to previous approved applications where completed work has varied from the approved drawings including: removal of modern stone garden wal26/00646/GBpending

What people apply for, and what gets approved

4,594 decided applications, grouped by what was being asked for. 92% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Internal alterations1,5111,305156 89%
Extension84077344 95%
Windows and doors67363530 95%
Garage, annexe or outbuilding37432438 90%
Roof works2222126 97%
Walls, fences and access20216920 89%
Change of use1481357 95%
Trees and landscaping13211610 92%
Two-storey extension1018414 86%
Garden building85795 94%
Loft or dormer817011 86%
Signs and shopfronts70653 96%
Porch55541 98%
Solar or heat pump38352 95%
New dwelling33257 78%
Demolish and rebuild27261 96%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Isle of Man

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to Isle of Man planning applications.

Who applies for permission here And who draws it up