Isle of Man

Isle of Man planning applications

4,893 applications from the island's planning register. Search by address, reference or what was proposed.

5 applications matching “8, PERWICK”

AddressProposalReferenceDecision
8, PERWICK ROAD, PORT ST. MARY, ISLE OF MAN, IM9 5PAExtensions and alterations to existing residential dwelling, installation of PV solar panels, landscaping work and erection of garden shed, gym and sa25/90107/BPermitted
8, PERWICK ROAD, PORT ST. MARY, ISLE OF MAN, IM9 5PAErection of a replacement dwelling with integral garage, associated landscaping and adjustment of the vehicular entrance23/00342/BPermitted
8, PERWICK ROAD, PORT ST. MARY, ISLE OF MAN, IM9 5PAMinor Change to 25/90107/B (Extensions and alterations to existing residential dwelling, installation of PV solar panels, landscaping work and erectio25/90656/MCHPermitted
8, PERWICK ROAD, PORT ST. MARY, ISLE OF MAN, IM9 5PAInstallation of cladding to front and rear elevations, an amendment to the size of the gymnasium building and material and colour changes to the ancil26/00264/BPermitted
8, PERWICK ROAD, PORT ST. MARY, ISLE OF MAN, IM9 5PAInformation in relation to Conditions 2 and 3 of PA 26/00264/B detailing metal cladding and other finishes26/10075/AIRPermitted

What people apply for, and what gets approved

4,594 decided applications, grouped by what was being asked for. 92% are granted overall — the interesting part is the spread.

What was applied forDecidedGrantedRefusedSuccess rate
Internal alterations1,5111,305156 89%
Extension84077344 95%
Windows and doors67363530 95%
Garage, annexe or outbuilding37432438 90%
Roof works2222126 97%
Walls, fences and access20216920 89%
Change of use1481357 95%
Trees and landscaping13211610 92%
Two-storey extension1018414 86%
Garden building85795 94%
Loft or dormer817011 86%
Signs and shopfronts70653 96%
Porch55541 98%
Solar or heat pump38352 95%
New dwelling33257 78%
Demolish and rebuild27261 96%

Withdrawn applications are counted in "decided" but never in a success rate — a withdrawal is usually a redesign, not a refusal. Categories are matched from the application's own wording, so a description mentioning two kinds of work lands in the first that fits.

While you are here

Everything the data says about Isle of Man

Planning records are a paper trail: an approval means permission was granted, not that the work was carried out. Our copy is refreshed nightly (last read 2026-08-20); for the live position on a specific application, go to Isle of Man planning applications.

Who applies for permission here And who draws it up